Start of Content Area
makespan (SCM-APO-OPT)

Optimization (SCM-APO-OPT)

Time span between the earliest possible start date/time of a production plan specified by the user and the end of the last non-fixed operation in the optimized plan. This can include operations that the system moved to after the optimization horizon during optimization.

This time span can be reduced with optimization.

End of Content Area