Start of Content Area
maximum lot size (SCM-APO-PPS)

Production Planning and Detailed Scheduling (SCM-APO-PPS)

Quantity that must not be exceeded during procurement.

The maximum lot size can be taken into consideration during the procurement quantity calculation.

End of Content Area