Start of Content Area
minimum takt time (PP-FLW)

Flow Manufacturing (PP-FLW)

The control parameters for takt-based scheduling.

The minimum takt time is the time for which a material remains in a takt of the production line for processing. It also determines the production quantity at which the production line is set.

End of Content Area