Start of Content Area
missing part (MM-IM)

Inventory Management (MM-IM)

Material in respect of which:

a) The missing parts check has been activated, and

b) The system has discovered - at the time of the posting of a normal goods receipt or other type of inward movement or at the time of a transfer posting - that in the past it has not been possible to cover requirements thereof as determined by Material Requirements Planning.

When it discovers such a stock shortage (requirement undercoverage) situation deriving from the past, the system issues a warning message and sends an e-mail to the responsible MRP controller in the plant.

End of Content Area