midpoint scheduling (PP)

Production Planning and Control (PP)

Type of scheduling with combining forward and backward scheduling starting from any midpoint operation in an order.

This type of scheduling is always used if the dates of an operation are changed during capacity leveling (in bottleneck planning, for example).